{"id":1682,"date":"2017-06-20T06:45:38","date_gmt":"2017-06-20T03:45:38","guid":{"rendered":"http:\/\/localhost:8080\/?p=1682"},"modified":"2026-10-19T10:35:10","modified_gmt":"2026-10-19T07:35:10","slug":"about-the-tubitak-1511-program","status":"publish","type":"post","link":"https:\/\/kompozit.org.tr\/en\/tubitak-1511-programi-hakkinda\/","title":{"rendered":"About the T\u00dcB\u0130TAK 1511 program"},"content":{"rendered":"<p>T\u00dcB\u0130TAK has announced a call for project proposals under 33 headings within the scope of the 2nd period of 2016 of the \u201cPriority Areas R&amp;D and Innovation Support Program\u201d coded 1511. The program is open to projects from companies of all sizes (capital companies). Projects prepared for this program can be designed to conduct R&amp;D activities directly or in collaboration with R&amp;D institutions, organizations, and businesses. Multiple applications can be submitted to the same call or different calls announced under this program. Applicant organizations must employ at least one person with a bachelor&#039;s or postgraduate degree related to the project subject as of the application date. To apply, pre-registration must be completed by submitting the project proposal title and documents related to the company&#039;s status to T\u00dcB\u0130TAK. For pre-registration, it is necessary to contact the T\u00dcB\u0130TAK personnel designated as the Pre-Registration Officer in the relevant call text.<\/p>\n<p><strong>Presentation introducing the TEYDEB 1511 program: <\/strong><a href=\"https:\/\/app.box.com\/s\/hl4x3rw2fu1d9y7dh7ms\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/app.box.com\/s\/hl4x3rw2fu1d9y7dh7ms<\/a><\/p>\n<p><strong>Past <\/strong><strong>Period calls: <\/strong><a href=\"http:\/\/www.tubitak.gov.tr\/tr\/destekler\/sanayi\/ulusal-destek-programlari\/1511\/icerik-cagri-arsivi\" target=\"_blank\" rel=\"noopener noreferrer\">http:\/\/www.tubitak.gov.tr\/tr\/destekler\/sanayi\/ulusal-destek-programlari\/1511\/icerik-cagri-arsivi<\/a><\/p>\n<p><strong>Current call areas:<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/mail.google.com\/mail\/u\/1\/?ui=2&amp;ik=79ab0d25fd&amp;view=lg&amp;msg=15cc4a9f0ad0962e#m_3100670134974227513__B%C4%B0LG%C4%B0_VE_%C4%B0LET%C4%B0%C5%9E%C4%B0M\" target=\"_blank\" rel=\"noopener noreferrer\">INFORMATION AND COMMUNICATION TECHNOLOGIES<\/a><\/li>\n<li><a href=\"https:\/\/mail.google.com\/mail\/u\/1\/?ui=2&amp;ik=79ab0d25fd&amp;view=lg&amp;msg=15cc4a9f0ad0962e#m_3100670134974227513__ENERJ%C4%B0\" target=\"_blank\" rel=\"noopener noreferrer\">ENERGY<\/a><\/li>\n<li><a href=\"https:\/\/mail.google.com\/mail\/u\/1\/?ui=2&amp;ik=79ab0d25fd&amp;view=lg&amp;msg=15cc4a9f0ad0962e#m_3100670134974227513__MAK%C4%B0NE_%C4%B0MALAT\" target=\"_blank\" rel=\"noopener noreferrer\">MACHINE MANUFACTURING<\/a><\/li>\n<li><a href=\"https:\/\/mail.google.com\/mail\/u\/1\/?ui=2&amp;ik=79ab0d25fd&amp;view=lg&amp;msg=15cc4a9f0ad0962e#m_3100670134974227513__METAL_VE_MADENC%C4%B0L%C4%B0K\" target=\"_blank\" rel=\"noopener noreferrer\">METAL AND MINING<\/a><\/li>\n<li><a href=\"https:\/\/mail.google.com\/mail\/u\/1\/?ui=2&amp;ik=79ab0d25fd&amp;view=lg&amp;msg=15cc4a9f0ad0962e#m_3100670134974227513__OTOMOT%C4%B0V\" target=\"_blank\" rel=\"noopener noreferrer\">AUTOMOTIVE<\/a><\/li>\n<li><a href=\"https:\/\/mail.google.com\/mail\/u\/1\/?ui=2&amp;ik=79ab0d25fd&amp;view=lg&amp;msg=15cc4a9f0ad0962e#m_3100670134974227513__K%C4%B0MYA\" target=\"_blank\" rel=\"noopener noreferrer\">CHEMICAL<\/a><\/li>\n<li><a href=\"https:\/\/mail.google.com\/mail\/u\/1\/?ui=2&amp;ik=79ab0d25fd&amp;view=lg&amp;msg=15cc4a9f0ad0962e#m_3100670134974227513__SA%C4%9ELIK_VE_B%C4%B0YOMED%C4%B0KAL\" target=\"_blank\" rel=\"noopener noreferrer\">HEALTH AND BIOMEDICAL<\/a><\/li>\n<li><a href=\"https:\/\/mail.google.com\/mail\/u\/1\/?ui=2&amp;ik=79ab0d25fd&amp;view=lg&amp;msg=15cc4a9f0ad0962e#m_3100670134974227513__GIDA_VE_TARIM\" target=\"_blank\" rel=\"noopener noreferrer\">FOOD AND AGRICULTURE<\/a><\/li>\n<\/ul>\n<p>The deadline for pre-registration is Friday, July 28, 2017 (at 5:30 PM).<\/p>\n<p>Application deadline: Friday, August 18, 2017 (5:30 PM)<\/p>\n<p>Announcement: <a href=\"http:\/\/www.tubitak.gov.tr\/tr\/duyuru\/1511-oncelikli-alanlar-ar-ge-destek-programi-kapsaminda-33-yeni-cagri-acildi\" target=\"_blank\" rel=\"noopener noreferrer\">http:\/\/www.tubitak.gov.tr\/tr\/duyuru\/1511-oncelikli-alanlar-ar-ge-destek-programi-kapsaminda-33-yeni-cagri-acildi<\/a><\/p>\n<p>Teydeb 1511 Program Page: <a href=\"http:\/\/www.tubitak.gov.tr\/1511\" target=\"_blank\" rel=\"noopener noreferrer\">http:\/\/www.tubitak.gov.tr\/1511<\/a><\/p>\n<p>Online application system (PRODIS): <a href=\"https:\/\/eteydeb.tubitak.gov.tr\/anasayfa.htm\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/eteydeb.tubitak.gov.tr\/anasayfa.htm<\/a><\/p>\n<p><strong>Newly opened call areas and topics:<\/strong><\/p>\n<p>The area to which the project proposal call relates<\/p>\n<p>Call sign and subject line<\/p>\n<p>Project budget upper limit<\/p>\n<p>Project duration upper limit<\/p>\n<p>Call details and contact information for relevant T\u00dcB\u0130TAK personnel.<\/p>\n<h4>INFORMATION AND COMMUNICATION TECHNOLOGIES<\/h4>\n<p>Cloud Computing<\/p>\n<p>1511-BIT-BBIL-2016-2: Cloud Computing - Development of Big Data Processing Technologies for the Manufacturing Sector and Production<\/p>\n<p>2.5 million TL<\/p>\n<p>(In joint projects, the budget cap is 3.5 million TL for the total project budget.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-bbil-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-bbil-2016-2.pdf<\/a><\/p>\n<p>Screen Technologies<\/p>\n<p>1511-BIT-EKRN-2016-1-1: Development of OLED display technology for consumer electronics and defense industry applications.<\/p>\n<p>5 million TL<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-ekrn-2016-1-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-ekrn-2016-1-1.pdf<\/a><\/p>\n<p>1511-BIT-EKRN-2016-1-2: Material Development for LED and OLED Display Technologies<\/p>\n<p>5 million TL<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-ekrn-2016-1-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-ekrn-2016-1-2.pdf<\/a><\/p>\n<p>1511-BIT-EKRN-2016-1-3: Development of next-generation display technologies<\/p>\n<p>5 million TL<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-ekrn-2016-1-3.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-ekrn-2016-1-3.pdf<\/a><\/p>\n<p>Broadband Technologies<\/p>\n<p>1511-BIT-GNBT-2016-2: Smart Optical and Wireless Networking Technologies<\/p>\n<p>4 million TL<\/p>\n<p>(The budget limit for joint projects is 6 million TL.)<\/p>\n<p>36 months<\/p>\n<p>(If the project consists solely of software applications, the maximum project duration is 24 months.)<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-gnbt-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-gnbt-2016-2.pdf<\/a><\/p>\n<p>Embedded Systems<\/p>\n<p>1511-BIT-GOMS-2016-2: Embedded Communications Systems Focused on Homeland Security<\/p>\n<p>3 million TL<\/p>\n<p>(In joint projects, the budget limit for the total project budget is 4 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-goms-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-goms-2016-2.pdf<\/a><\/p>\n<p>Mobile Communication Technologies<\/p>\n<p>1511-BIT-MILT-2016-2: Innovative Heterogeneous Mobile Network Technologies<\/p>\n<p>4 million TL<\/p>\n<p>(The budget limit for joint projects is 6 million TL.)<\/p>\n<p>36 months<\/p>\n<p>(If the project consists solely of software applications, the maximum project duration is 24 months.)<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-milt-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-milt-2016-2.pdf<\/a><\/p>\n<p>Micro\/Nano\/Opto-Electronic Technologies (MEMS, NEMS, MOEMS) and Semiconductor Technologies<\/p>\n<p>1511-BIT-MNOE-2016-2: Development of Thermal Cameras and Detector Arrays<\/p>\n<p>4 million TL<\/p>\n<p>(The budget limit for joint projects is 5 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-mnoe-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-mnoe-2016-2.pdf<\/a><\/p>\n<p>Mobile Application (Cloud Computing)<\/p>\n<p>1511-BIT-MUYG-2016-2: Next-Generation Mobile Application Development, Runtime, and Testing Environments<\/p>\n<p>2 million TL<\/p>\n<p>(The budget limit for joint projects is 2.5 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-muyg-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-bit-muyg-2016-2.pdf<\/a><\/p>\n<p>Micro\/Nano\/Opto-Electronic Technologies (MEMS, NEMS, MOEMS) and Semiconductor Technologies<\/p>\n<p>1511-HVU-UCAK-2016-2: Development of Avionics, Image Acquisition and Processing Systems for Unmanned Aerial Vehicles<\/p>\n<p>4 million TL<\/p>\n<p>(The budget limit for joint projects is 5 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-hvu-ucak-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-hvu-ucak-2016-2.pdf<\/a><\/p>\n<h4>ENERGY<\/h4>\n<p>Energy Efficiency in Residential and Commercial Buildings<\/p>\n<p>1511-ENE-EVKN-2016-2: Development of industrial LED luminaires, drivers and automation.<\/p>\n<p>2 million TL<\/p>\n<p>(The budget limit for joint projects is 2.5 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-evkn-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-evkn-2016-2.pdf<\/a><\/p>\n<p>Energy Efficiency in Industry \u2013 Specialized Electric Motor Technologies<\/p>\n<p>1511-ENE-EVSA-2016-1: Development of design and optimization software for the production of high-efficiency electric motors conforming to IE3 and above (IE4) standards.<\/p>\n<p>3 million TL<\/p>\n<p>(In joint projects, the budget limit for the total project budget is 4 million TL.)<\/p>\n<p>30 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-evsa-2016-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-evsa-2016-1.pdf<\/a><\/p>\n<p>Energy Efficiency in Industry<\/p>\n<p>1511-ENE-EVSA-2016-2: Development and Demonstration of ORC Technologies for Energy Efficiency in Industry<\/p>\n<p>3 million TL<\/p>\n<p>(The budget limit for joint projects is 3 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-evsa-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-evsa-2016-2.pdf<\/a><\/p>\n<p>Solar energy<\/p>\n<p>1511-ENE-GUNS-2016-2: Development of Production Processes for Solar Cells and Establishment of a Pilot Production Line<\/p>\n<p>5 million TL<\/p>\n<p>(The budget limit for joint projects is 5 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-guns-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-guns-2016-2.pdf<\/a><\/p>\n<p>Coal<\/p>\n<p>1511-ENE-KOMR-2016-2: Improvement and Demonstration of Coal Combustion Systems<\/p>\n<p>7 million TL<\/p>\n<p>(The budget limit for joint projects is 7 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-komr-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-ene-komr-2016-2.pdf<\/a><\/p>\n<h4>MACHINE MANUFACTURING<\/h4>\n<p>Robotics Mechatronics<\/p>\n<p>1511-MAK-IMLT-2016-2: Flexible and Intelligent Manufacturing Systems<\/p>\n<p>2.5 million TL<\/p>\n<p>30 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mak-imlt-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mak-imlt-2016-2.pdf<\/a><\/p>\n<p>1511-MAK-OTOM-2016-2: Safe Manufacturing Lines<\/p>\n<p>2.5 million TL<\/p>\n<p>30 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mak-otom-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mak-otom-2016-2.pdf<\/a><\/p>\n<p>1511-MAK-ROME-2016-2: Servo Motor Technologies<\/p>\n<p>2.5 million TL<\/p>\n<p>30 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mak-rome-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mak-rome-2016-2.pdf<\/a><\/p>\n<p>Materials Technologies<\/p>\n<p>1511-MAK-TZGH-2016-2: Machine Tools and Apparatus - Innovative Press Systems<\/p>\n<p>5 million TL<\/p>\n<p>(The budget limit for joint projects is 5 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mak-tzgh-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mak-tzgh-2016-2.pdf<\/a><\/p>\n<h4>METAL AND MINING<\/h4>\n<p>Low Grade Ore<\/p>\n<p>1511-MMD-METL-2016-1: Development of Technologies for the Enrichment and\/or Utilization of Low-Grade Chromium, Manganese, and Iron Ores<\/p>\n<p>3 million TL<\/p>\n<p>(The budget limit for joint projects is 3 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mmd-metl-2016-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-mmd-metl-2016-1.pdf<\/a><\/p>\n<h4>AUTOMOTIVE<\/h4>\n<p>Component Manufacturing Technologies<\/p>\n<p>1511-OTO-AKUT-2016-2: Development of Concept Vehicles<\/p>\n<p>3 million TL<\/p>\n<p>(The budget limit for joint projects is 3 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-akut-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-akut-2016-2.pdf<\/a><\/p>\n<p>Embedded Systems Technologies<\/p>\n<p>1511- OTO-GOMS-2016-2: Development of Technologies for V2X Communication Layers<\/p>\n<p>2 million TL<\/p>\n<p>(The budget limit for joint projects is 3 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-goms-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-goms-2016-2.pdf<\/a><\/p>\n<p>Electric and Hybrid Vehicle Technologies<\/p>\n<p>1511-OTO-HEAT-2016-2: Development of Battery and Energy Management Systems for Electric and Hybrid Vehicles<\/p>\n<p>3 million TL<\/p>\n<p>(The budget limit for joint projects is 4 million TL.)<\/p>\n<p>24 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-heat-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-heat-2016-2.pdf<\/a><\/p>\n<p>Internal Combustion Engine Technologies<\/p>\n<p>1511-OTO-IYMT-2016-1: Development of Innovative Internal Combustion Engines for Hybrid Vehicles<\/p>\n<p>5 million TL<\/p>\n<p>(The budget limit for joint projects is 5 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-iymt-2016-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-iymt-2016-1.pdf<\/a><\/p>\n<p>Materials Technologies<\/p>\n<p>1511-OTO-MALZ-2016-2: Development of Technologies for Polymer Composite Materials<\/p>\n<p>5 million TL<\/p>\n<p>(The budget limit for joint projects is 7 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-malz-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-malz-2016-2.pdf<\/a><\/p>\n<p>Production Systems<\/p>\n<p>1511-OTO-URTM-2016-2: Development of Modular, Flexible, and Intelligent Production Systems to Meet the Needs of the Automotive Sector<\/p>\n<p>7.5 million TL<\/p>\n<p>(The budget limit for joint projects is 7.5 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-urtm-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-oto-urtm-2016-2.pdf<\/a><\/p>\n<h4>CHEMICAL<\/h4>\n<p>Main Chemicals<\/p>\n<p>1511-KMY-ANAK-2016-1: Development of Industrial Basic Chemicals\/Active Ingredients and Production Technologies<\/p>\n<p>3 million TL<\/p>\n<p>(The budget limit for joint projects is 3 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-kmy-anak-2016-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-kmy-anak-2016-1.pdf<\/a><\/p>\n<h4>HEALTH AND BIOMEDICAL<\/h4>\n<p>Biomedical Equipment<\/p>\n<p>1511-SAB-BMED-2016-2: Development of Personalized Surgical Planning and Training Support Simulators<\/p>\n<p>The maximum project budget for projects aimed at developing simulators for surgical planning and training purposes is 3 million TL.<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-sab-bmed-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-sab-bmed-2016-2.pdf<\/a><\/p>\n<p>The upper limit for project budgets for proposals aimed at developing subcomponents that can be used in simulators for surgical planning and training purposes is 750,000 TL.<\/p>\n<p>1511-SAB-ESAG-2016-2: Development of Biomedical Equipment for Home Patient Care<\/p>\n<p>3 million TL<\/p>\n<p>30 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-sab-esag-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-sab-esag-2016-2.pdf<\/a><\/p>\n<p>Medical Diagnostic Devices<\/p>\n<p>1511-SAB-TANI-2016-1: Prenatal and Postnatal Screening and Diagnostic Kits<\/p>\n<p>2.5 million TL<\/p>\n<p>(The budget limit for joint projects is 2.5 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-sab-tani-2016-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-sab-tani-2016-1.pdf<\/a><\/p>\n<p>The total project budget limit for projects in which the device is developed, including the kit, is 3 million TL.<\/p>\n<h4>FOOD AND AGRICULTURE<\/h4>\n<p>Food Biotechnology<\/p>\n<p>1511-GDA-BIYO-2016-2: Development of Biotechnological Products and Processes for the Food Industry<\/p>\n<p>3 million TL<\/p>\n<p>(The budget limit for joint projects is 3 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-gda-biyo-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-gda-biyo-2016-2.pdf<\/a><\/p>\n<p>Food Safety<\/p>\n<p>1511-GDA-GGUV-2016-2: Innovative Technologies for Food Safety<\/p>\n<p>3 million TL<\/p>\n<p>(The budget limit for joint projects is 3 million TL.)<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-gda-gguv-2016-2.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-gda-gguv-2016-2.pdf<\/a><\/p>\n<p>Field and Garden Crops<\/p>\n<p>1511-GDA-TABA-2016-1: Field and Garden Products<\/p>\n<p>2 million TL<\/p>\n<p>36 months<\/p>\n<p><a href=\"https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-gda-taba-2016-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tubitak.gov.tr\/sites\/default\/files\/292\/1511-gda-taba-2016-1.pdf<\/a><\/p>\n<p><strong>Who can apply?<\/strong><\/p>\n<p>Capital companies of all sizes that employ at least one staff member with a bachelor&#039;s or postgraduate degree related to the project subject.<\/p>\n<p><strong>Support amount<\/strong><\/p>\n<ul>\n<li>Project budget upper limit: Determined separately for each topic (see information notes detailing the call for proposals).<\/li>\n<li>Destekleme oran\u0131: B\u00fcy\u00fck \u00f6l\u00e7ekli i\u015fletmeler i\u00e7in %60, KOB\u0130ler i\u00e7in %75 (Makine, te\u00e7hizat, alet al\u0131mlar\u0131nda farkl\u0131 oran uygulamas\u0131 i\u00e7in bkz. desteklenen harcamalar)<\/li>\n<\/ul>\n<p><strong>Supported expenditure items<\/strong><\/p>\n<ul>\n<li>Personnel expenses (PhD: maximum 14 times the minimum gross wage; Bachelor&#039;s degree (graduated 48 months or more ago): maximum 12 times the minimum gross wage; Bachelor&#039;s degree (graduated less than 48 months ago): maximum 8 times the minimum gross wage; Associate&#039;s degree: maximum 5 times the minimum gross wage; High school education or lower: maximum 4 times the minimum gross wage)<\/li>\n<li>Intercity and international economy class travel expenses (accommodation not supported)<\/li>\n<li>Makine, te\u00e7hizat (Seri \u00fcretimde de kullan\u0131lacak olmas\u0131 halinde \u201cmaliyet x proje s\u00fcresi (ay) x %2\u201d destek oran\u0131 uygulan\u0131r; oransal destek alt s\u0131n\u0131r\u0131 %40 olup makine ve te\u00e7hizat\u0131n faydal\u0131 \u00f6mr\u00fcn\u00fcn \u00f6nemli k\u0131sm\u0131n\u0131 seri \u00fcretim s\u00fcre\u00e7lerinde kullan\u0131lacak olmas\u0131 halinde komite karar\u0131yla alt s\u0131n\u0131r %25\u2019e indirilebilir.)<\/li>\n<li>Software<\/li>\n<li>Broadcast acquisition<\/li>\n<li>Domestic consulting and other service procurement.<\/li>\n<li>Yurtd\u0131\u015f\u0131 dan\u0131\u015fmanl\u0131k ve di\u011fer hizmeti (proje b\u00fct\u00e7esinin azami %20\u2019si; yurt i\u00e7inde yap\u0131lmas\u0131 m\u00fcmk\u00fcn olmayan test vb. hizmet al\u0131mlar\u0131 i\u00e7in Komite onay\u0131yla \u00fcst s\u0131n\u0131r kald\u0131r\u0131labilir.)<\/li>\n<li>Research and development (R&amp;D) service expenses received from universities in T\u00fcrkiye, R&amp;D units affiliated with T\u00dcB\u0130TAK, private sector R&amp;D companies, and other R&amp;D institutions and organizations.<\/li>\n<li>Genel giderler: Destek personeli, elektrik, su, gaz, bak\u0131m-onar\u0131m, haberle\u015fme vs. (Proje b\u00fct\u00e7esinin %10\u2019u)<\/li>\n<\/ul>\n<p>VAT is not supported. For other unsupported expenses, please see the attached document. <a href=\"http:\/\/www.tubitak.gov.tr\/sites\/default\/files\/1511-ue-060216-251.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">TEYDEB 1511 Implementation Guidelines<\/a> Article 13 (p. 9).<\/p>\n<p><strong>General points to consider<\/strong><\/p>\n<ul>\n<li>Before applying <a href=\"http:\/\/www.tubitak.gov.tr\/sites\/default\/files\/1511-ue-060216-251.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">TEYDEB 1511 Implementation Principles<\/a> It is of utmost importance to read the Call Terms (see call documents linked above). The Call Terms contain the specific technical and administrative requirements for project applications related to that call.<\/li>\n<li>T\u00dcB\u0130TAK support programs are administered by the Ankara headquarters, not the T\u00dcB\u0130TAK Gebze Campus in Gebze (Kocaeli). Contact information for program officials is provided separately for each specific call (see the specific call documents linked above).<\/li>\n<li>Turkish capital companies, regardless of sector or size, can apply to the Teydeb 1511 program.<\/li>\n<li>Applicant organizations must employ at least one staff member with a bachelor&#039;s or postgraduate degree related to the project subject as of the application date.<\/li>\n<li>Multiple applications can be submitted to the same call for proposals or to different calls for proposals under this program. There is no upper limit on the number of applications.<\/li>\n<\/ul>\n<ul>\n<li>To submit a project application, the Project Proposal Title and documents regarding the status of the Applicant Organization must be submitted to T\u00dcB\u0130TAK and pre-registration approval must be obtained. The contact information of the Pre-registration Officer is specified in each call for proposals document.<\/li>\n<\/ul>\n<ul>\n<li>When preparing your project application, it is recommended to contact the relevant call center official whose contact information is provided above for information.<\/li>\n<li>Collaboration with universities and\/or research institutes on projects provides an advantage in evaluations, and such collaboration is supported within the scope of project partnerships or consultancy and service procurement.<\/li>\n<\/ul>\n<ul>\n<li>The earliest project start date is the first day of the month in which the project application is submitted. The latest project start date should be the first day of the month following the month in which the decision is notified.<\/li>\n<\/ul>\n<ul>\n<li>One or more of the following expenses, which are normally not supported, may be included in the scope of support during the project evaluation if they are deemed necessary for R&amp;D: \u201cheating, lighting and energy costs used in production, water expenses, telephone, fax, communication, internet, construction and installation expenses, and stationery expenses.\u201d.<\/li>\n<li>The machinery, equipment, systems, modules, and software acquired within the scope of the project are the property of the beneficiary organization\/company.<\/li>\n<li>Intellectual\/Industrial Property Rights that may arise within the scope of the project may be transferred to the organization, provided that this is stated in the project contract.<\/li>\n<li>If an organization\/company applying for a project purchases R&amp;D services from another organization, and these services constitute a significant part of the project, the organizations may be required to submit a joint project application or separate applications simultaneously, in order to allow for the evaluation and monitoring of all R&amp;D activities within the project.<\/li>\n<li>Yararlan\u0131c\u0131 kurulu\u015f\/firma projenin ilk d\u00f6neminde destek tutar\u0131n\u0131n azami %25\u2019i tutar\u0131nda \u00f6n \u00f6demeden (transfer \u00f6demesi) yararlanabilir. Takip eden d\u00f6nemlerde ise b\u00fct\u00e7eden ge\u00e7mi\u015f d\u00f6nemlerdeki harcama tutarlar\u0131 d\u00fc\u015f\u00fcld\u00fckten sonra kalan tahmini proje b\u00fct\u00e7esinin %25 \u00fczerinden \u00f6n \u00f6deme yap\u0131labilir. \u00d6n \u00d6deme, ilk \u00f6demenin %25 fazlas\u0131 \u00fczerinden teminat kar\u015f\u0131l\u0131\u011f\u0131 yap\u0131l\u0131r.<\/li>\n<li>Intellectual\/Industrial Property Rights such as Patents, Utility Models, and Industrial Designs are not supported under the 1511 program. For registration procedures and patent attorney fees for Intellectual\/Industrial Property Rights that may arise within the scope of such projects, support can be obtained from T\u00dcB\u0130TAK (for patents) and KOSGEB (for patents, utility models, industrial designs, or integrated circuit topography).<\/li>\n<\/ul>\n<ul>\n<li>Proje ara-rapor d\u00f6nemlerinde adam-ay de\u011feri de\u011fi\u015fiklikleri, projenin tamam\u0131 i\u00e7in ihtiya\u00e7 duyulan ve proje s\u00f6zle\u015fmesinden \u00f6nce PROD\u0130S\u2019teki en son AGY111\u2019deki toplam adam-ay de\u011ferinin %30\u2019unu ge\u00e7miyorsa \u0130zleyici de\u011ferlendirmesi ile sonu\u00e7land\u0131r\u0131l\u0131r. %30 \u00fczeri art\u0131\u015flar ise \u0130zleyici ve Y\u00fcr\u00fctme Komitesi de\u011ferlendirmesi ile kabul edilebilir.<\/li>\n<li>Personel giderleri d\u0131\u015f\u0131ndaki giderlere ili\u015fkin nicelik veya nitelik de\u011fi\u015fiklik taleplerinden kaynaklanan (\u00f6rne\u011fin, ilave bir te\u00e7hizat al\u0131m\u0131, malzeme miktar\u0131ndaki art\u0131\u015f, te\u00e7hizat\u0131n yeni bir modelinin al\u0131m\u0131 gibi) personel giderleri hari\u00e7 proje s\u00f6zle\u015fmesinden \u00f6nce PROD\u0130S\u2019teki en son toplam tahmini b\u00fct\u00e7enin %30\u2019unu ge\u00e7meyen art\u0131\u015flar \u0130zleyici G\u00f6r\u00fc\u015f\u00fcne istinaden kabul edilebilir. %30 \u00fczeri art\u0131\u015flar ise \u0130zleyici G\u00f6r\u00fc\u015f\u00fc ve Y\u00fcr\u00fctme Komitesi de\u011ferlendirmesi ile kabul edilebilir.<\/li>\n<li>Apart from man-month value changes, when the suitability of personnel changes is deemed necessary, decisions are made based on observer opinion.<\/li>\n<\/ul>\n<ul>\n<li>Support will be provided for expenses (based on the date of expenditure and expense documentation) for tools, equipment, software, and materials procured from abroad and included in the project budget, up to a maximum of 3 months prior to the project support start date.<\/li>\n<li>It should also be determined whether the prepared project is eligible for other government support. The amounts received from other government support within the scope of the project should be deducted from the project expenditure budget items to determine the amount eligible for support.<\/li>\n<li>Projects prepared within the scope of public tenders must be reported to T\u00dcB\u0130TAK during the application process.<\/li>\n<\/ul>\n<ul>\n<li>Frequently Asked Questions (FAQ): <a href=\"http:\/\/www.tubitak.gov.tr\/tr\/destekler\/sanayi\/ulusal-destek-programlari\/1511\/icerik-sikca-sorulan-sorular\" target=\"_blank\" rel=\"noopener noreferrer\">http:\/\/www.tubitak.gov.tr\/tr\/destekler\/sanayi\/ulusal-destek-programlari\/1511\/icerik-sikca-sorulan-sorular<\/a><\/li>\n<\/ul>\n<p><strong>Evaluation criteria<\/strong><\/p>\n<ul>\n<li>Industrial R&amp;D Content, Technology Level, and Innovative Aspects of the Project<\/li>\n<li>Project Plan and Suitability of the Organization&#039;s Infrastructure<\/li>\n<li>Potential for Project Outputs to be Converted into Economic Benefits and National Gains<\/li>\n<\/ul>\n<p><strong>Application and evaluation process<\/strong><\/p>\n<ul>\n<li>Pre-registration<\/li>\n<li>Call closing<\/li>\n<li>The Invited Projects Advisory Board (IPB) conducts a preliminary review of project applications submitted under the call for proposals. Following the preliminary review, the IPB may request the applicant organization to complete any insufficient information and missing documents in the project application within the defined timeframe.<\/li>\n<li>The Project Coordination Committee (PCC) evaluates project proposals, including peer review if deemed necessary. If necessary, and with the approval of the relevant Executive Committee, it may establish panels composed of individuals with expertise in the subject and scope of the call for proposals. The PCC may request project presentations from applicants. The PCC submits its evaluation results and decision recommendations to the Executive Committee.<\/li>\n<li>The Executive Committee&#039;s approval is submitted to the Presidency for final approval.<\/li>\n<li>Following ministerial approval, project applicants will be notified of the results via email and\/or PROD\u0130S. (Approximately no later than 90 days after the application deadline)<\/li>\n<li>A project agreement will be signed between the Applicants of the projects to be supported and T\u00dcB\u0130TAK.<\/li>\n<\/ul>\n<p><strong>For communication and information: <\/strong><\/p>\n<ul>\n<li>1511@tubitak.gov.tr (It is recommended to specify the relevant call code in information requests.)<\/li>\n<li>The final section of each call for proposals includes the contact information of the T\u00dcB\u0130TAK personnel responsible for the call.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>T\u00dcB\u0130TAK, 1511 kodlu \u201c\u00d6ncelikli Alanlar Ar-Ge ve \u0130novasyon Destek Program\u0131n\u0131n\u201d 2016 y\u0131l\u0131 2. D\u00f6nemi kapsam\u0131nda 33 ba\u015fl\u0131kta proje teklif \u00e7a\u011fr\u0131s\u0131 ilan etmi\u015ftir. Program her \u00f6l\u00e7ekten \u015firketin (sermaye \u015firketleri) projelerine a\u00e7\u0131kt\u0131r. Bu programa\u2026<\/p>","protected":false},"author":1,"featured_media":1683,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[55],"tags":[],"class_list":["post-1682","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-duyurular"],"_links":{"self":[{"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/posts\/1682","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/comments?post=1682"}],"version-history":[{"count":1,"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/posts\/1682\/revisions"}],"predecessor-version":[{"id":1684,"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/posts\/1682\/revisions\/1684"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/media\/1683"}],"wp:attachment":[{"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/media?parent=1682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/categories?post=1682"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kompozit.org.tr\/en\/wp-json\/wp\/v2\/tags?post=1682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}